PDFÏÂÔØ ·ÖÏí
[1]ãÆ ËÉ,Àî ±ó,Àî ·æ.½á¹¹¶¯Á¦Ñ§Ä£ÐÍÐÞÕý¼¼ÊõÔÚÒºÌå»ð¼ý·¢¶¯»úÖеÄÓ¦ÓÃ[J].»ð¼ýÍƽø,2018,44(01):27-35.
¡¡YAN Song,LI Bin,LI Feng.Application of structural dynamic model updating technique in liquid rocket engine[J].Journal of Rocket Propulsion,2018,44(01):27-35.
µã»÷¸´ÖÆ

½á¹¹¶¯Á¦Ñ§Ä£ÐÍÐÞÕý¼¼ÊõÔÚÒºÌå»ð¼ý·¢¶¯»úÖеÄÓ¦ÓÃ

²Î¿¼ÎÄÏ×/References:

[1] Àî±ó,¶¡·áÄê,ÕÅСƽ.ÔØÈ˵ÇÔÂÍƽøϵͳ[M].±±¾©:ÖйúÓ³ö°æÉç,2011.
[2] JAMES P,ROBIN P,KERNILIS A.Dynamic testing,finite element simulation of the vulcain engine,updating and application to buffeting load case [C]// Proceedings of European Conference on Spacecraft Structures,Materials and Mechanical Testing.Braunschweig,Germany:[s.n.],1999:111-118.
[3] CHRISTENSEN E R,BROWN A M,FRADY G P.Calculation of dynamic loads due to random vibration environments in rocket engine systems [C]// Proceedings of 48th AIAA/ASME/ASCE/AHS/ASC Structures,Structural Dynamics,and Materials Conference.Honolulu,Hawaii:AIAA,2007:120-127.
[4] Àî±ó.¹¹½¨»ù´¡Ñо¿Æ½Ì¨,Íƶ¯ÒºÌ嶯Á¦¼¼Êõ´´Ð·¢Õ¹[J].»ð¼ýÍƽø.2014,40(1):1-9.
LI Bin.Establishment of fundamental research platform for promoting innovative development of liquid propulsion technology [J].Journal of rocket propulsion,2014,40(1):1-9.
[5] CHRISTENSEN E R,FRADY G.Structural dynamic analysis of the X-34 rocket engine:AIAA-98-2012 [R].USA:AIAA,1998.
[6] FRADY G,JENNINGS J M,MIMS K,et al.Engine system loads analysis compared to hot-fire data [C]// Proceedings of 43rd AIAA/ASME/ASCE/AHS/ASC Structures,Structural Dynamics,and Materials Conference.Denver,Colorado,2002:1-13.
[7] BROWN A M.Temperature-dependent modal testanalysis correlation of X-34 FASTRAC composite rocket nozzle [J].Journal of propulsion and power,2002,18(2):284-288.
[8] MULLER G R.Finite element models of the space shuttle main engine:NASA TM-78260 [R].USA:NASA,1980.
[9] FOLEY M J,TILLEY D M,WELCH C T.SSME structural dynamic model development-final report.NASA-CR-170960 [R].USA:NASA,1983.
[10] FOLEY M J,WILSON V L.SSME structural dynamic model development-phase ¢ò.NASA-CR-178708 [R].USA:NASA,1985.
[11] FOLEY M J.SSME structural dynamic model development-final report.NASA-CR-183671 [R].USA:NASA,1989.
[12] BAKER M,PRAY C.Understanding critical dynamic loads for nozzle and nozzle extension design [C]// Proceedings of 47th AIAA/ASME/SAE/ASEE Joint Propulsion Conference & Exhibit.San Diego,California:AIAA,2011:123-129.
[13] Standardization European Cooperation for Space.Space engineering:structural finite element models ECSS-E-ST-32-03C- 2008 [S].[S.l.:s.n.],2008:3.
[14] National Aeronautics and Space Administration.Load analyses of spacecraft and payloads:NASA-STD-5002 [S].USA:NASA,1996:1.
[15] Àî·æ.ÒºÑõúÓÍ·¢¶¯»úµÍƵ½á¹¹¶¯Á¦Ñ§ÐÞ¸ÄÑо¿[D].Î÷°²:Î÷±±¹¤Òµ´óѧ,2011.
[16] »ÆµÀÇí,ÕżÌÍ©,ºÎºéÇì.ËÄ»ú²¢Áª·¢¶¯»úµÍƵ¶¯Ì¬ÌØÐÔ·ÖÎö[J].»ð¼ýÍƽø.2004,30(4):27-31.
HUANG Daoqiong,ZHANG Jitong,HE Hongqing.Low frequency dynamic characteristics of four parallel connected engines [J].Journal of rocket propulsion,2004,30(4):27-31.
[17] ¶­Ñ°»¢,ÕÅÏþÂþ.ij»ð¼ý·¢¶¯»úϵͳÕñ¶¯ÌØÐÔ²âÊԺͷÂÕæ·ÖÎö[J].»ð¼ýÍƽø.2006,32(1):54-58.
DONG Xunhu,ZHANG Xiaoman.Dynamics test and simulation of a launch vehicle engine system [J].Journal of rocket propulsion,2006,32(1):54-58.
[18] ãÆËÉ,Àî±ó,Àî±ó³±µÈ.ÈýάɨÃè²âÕñ¼¼ÊõÔÚÒºÌå»ð¼ý·¢¶¯»úģ̬ÊÔÑéÖÐÓ¦ÓÃ[J].Óѧ±¨.2017,38(1):97-103.
[19] YAN S,LI B,LI F,et al.Finite element model updating of liquid rocket engine nozzle based on modal test results obtained from 3-D SLDV technique [J].Aerospace Science and Technology,2017,69:412-418.
[20] COLLINS J D,HART G C,HASELMAN T K,et al.Statistical identification of structures [J].AIAA Journal,1974,12(2):185-190.
[21] BOSWALD M,LINK M,SCHEDLINSKI C.Computational model updating and validation of aero-engine finite element models based on vibration test data [C]// Proceedings of Conference:International Forum on Aeroelasticity and Structural Dynamics.Munich,Germany:[s.n.],2005:221-228.
[22] HATCH C,SKINGLE G W,GREAVES C H,et al.Methods for refinement of structural finite element models:summary of the GARTEUR AG14 collaborative programme[C]// Proceedings of the 32nd European Rotorcraft Forum.Maastricht,Netherlands:[s.n.],2006:24-29.
[23] LIM J H.A correlation study of satellite finite element model for coupled load analysis using transmissibility with modified correlation measures [J].Aerospace science and technology,2014,33(1):82-91.
[24] DOUPE C C,SWENSON E D,GEORGE L E,et al.Finite element model tuning with 3D mode shapes from FalconSAT-5 [C]// 50th AIAA/ASME/ASCE/AHS/ASC Structures,Structural Dynamics,and Materials Conference.Palm Springs,California:AIAA,2009:18-26.
[25] ºéÁ¼ÓÑ,¼ÖÁÁ,ÎâÑÞºìµÈ.º½Ìì½á¹¹¶¯Á¦Ñ§Ä£ÐÍÐÞÕý·½·¨Ñо¿[J],Ç¿¶ÈÓë»·¾³.2015,42(1):23-30.
[26] ¶¡¼Ì·å,º«ÔöÒ¢,ÂíÐËÈð.´óÐ͸´ÔÓº½ÌìÆ÷½á¹¹ÓÐÏÞԪģÐ͵ÄÑéÖ¤²ßÂÔÑо¿[J],Óѧ±¨.2010,31(2):547-555.
[27] MARWALA T,SIBISI S.Finite element model updating using Bayesian framework and modal properties[J].Journal of aircraft,2005,42(1):275-278.
[28] PAK C,TRUONG S.Creating a test-validated finite-element model of the X-56A aircraft structure [J].Journal of aircraft.2014,51(2):1-24.
[29] JIN S S,CHO S,JUNG H J,et al.A new multi-objective approach to finite element model updating[J].Journal of sound and vibration,2014,333(11):2323-2338.
[30] JAISHI B,REN W X.Finite element model updating based on eigenvalue and strain energy residuals using multiobjective optimisation technique [J].Mechanical systems and signal processing,2007,21(5):2295-2317.
[31] BOULKAIBET I,MTHEMBU L,MARWALA T,et al.Finite element model updating using the shadow hybrid Monte Carlo technique [J].Mechanical systems and signal processing,2015,52:115-132.
[32] MOTTERSHEAD J E.Model updating in structural dynamics:a survey [J].Journal of sound and vibration,1993,167(2):347-375.
[33] Öìºêƽ,Ðì±ó,»ÆÓñÓ¯.½á¹¹¶¯Á¦Ä£ÐÍÐÞÕý·½·¨µÄ±È½ÏÑо¿¼°ÆÀ¹À[J].Á¦Ñ§½øÕ¹.2002,32(4):513-525.
[34] Àî»Ô,¶¡èë.½á¹¹¶¯Á¦Ä£ÐÍÐÞÕý·½·¨Ñо¿½øÕ¹[J].Á¦Ñ§½øÕ¹.2005,35(2):170-180.
[35] ÑîÖÇ´º,ÍõÀÖ,Àî±ó,µÈ.½á¹¹¶¯Á¦Ñ§ÓÐÏÞԪģÐÍÐÞÕýµÄÄ¿±êº¯Êý¼°Ëã·¨[J].Ó¦ÓÃÁ¦Ñ§Ñ§±¨.2009(02):288-296.
[36] ¹ùÇÚÌÎ,ÕÅÁîÃÖ,·ÑÇì¹ú.½á¹¹¶¯Á¦Ñ§ÓÐÏÞԪģÐÍÐÞÕýµÄ·¢Õ¹-Ä£ÐÍÈ·ÈÏ[J].Á¦Ñ§½øÕ¹.2006,36(1):36-42.
[37] LEE N L.Comparative study of model updating methods based on 2D finite element models for a practical tower structure [J].¹¤³Ì¿Æ¼¼Óë½ÌÓýѧ¿¯,2014,11(1):43-51.
[38] VEPS ÿ?‚‡ A,HAAPANIEMI H,LUUKKANEN P,et al.Application of finite element model updating to a feed water pipeline of a nuclear power plant [J].Nuclear engineering and design,2005,235(17):1849-1865.
[39] ½¯Òú¾ü.»ùÓÚÏìÓ¦Ãæ·½·¨µÄ¸´ÔӽṹģÐÍÐÞÕý·½·¨Ñо¿[D].Î人:Î人´óѧ,2011.
[40] ·ÑÇì¹ú,º«ÏþÁÖ,ËÕº×Áá.ÏìÓ¦ÃæÓÐÏÞԪģÐÍÐÞÕýµÄʵÏÖÓëÓ¦ÓÃ[J].Õñ¶¯¡¢²âÊÔÓëÕï¶Ï.2010,30(2):132-134.
[41] ÓÚ¿ªÆ½,ÁõÈÙºØ.¶à×åȺÁ£×ÓȺÓÅ»¯Ëã·¨·ÉÐÐÆ÷½á¹¹Ä£ÐÍÐÞÕý[J].Õñ¶¯Óë³å»÷.2013,32(17):79-83.
[42] AHMADIAN H,MOTTERSHEAD J E,FRISWELL M I.Regularisation methods for finite element model updating[J].Mechanical systems and signal processing,1998,12(1):47-64.
[43] HASAN W M,VIOLA E.Use of the singular value decomposition method to detect ill-conditioning of structural identification problems [J].Computer & structure,1997,63(2):267-275.[44] FRISWELL M I,MOTTERSHEAD J E,AHMADIAN H.Finite element model updating using experimental test data:parametrization and regularization [J].Philosophical Transactions of the Royal Society of London A:mathematical,physical and engineering sciences,2001,359:169-186.
[45] TIKHONOV A N,ARSENIN V Y.Solutions of ill-posed problems [M].New York:John Wiley,1977.
[46] HANSEN P C.Analysis of discrete ill-posed problems by means of the L-curve [J].SIAM seview,1992,34(4):561-580.
[47] MEZZAPESA S A,ARRAS M,COPPOTELLI G,et al.Correlation and updating of an unmanned aerial vehicle finite element model [C]// Proceedings of 56th AIAA/ASCE/AHS/ASC Structures,Structural Dynamics,and Materials Conference.Kissimmee,Florida:AIAA,2015:123-131.

ÏàËÆÎÄÏ×/References:

[1]Ö£ ΰ,ÀÁÖ,³Âкì.¼¤¹â¿ìËÙ³ÉÐμ¼ÊõÔÚÒºÌ嶯Á¦ÁìÓòµÄÓ¦ÓÃÇ°¾°[J].»ð¼ýÍƽø,2015,41(06):1.
¡¡ZHENG Wei,LI Hulin,CHEN Xinhong.Application prospect of laser rapid prototyping technology in the field of liquid power[J].Journal of Rocket Propulsion,2015,41(01):1.
[2]¹ù ¾´,Ëξ§¾§,¿×·²³¬.·¢¶¯»úÍƽø¼ÁÔöѹÊäËÍϵͳ½¨Ä£·ÂÕæ¼¼Êõ×ÛÊö[J].»ð¼ýÍƽø,2015,41(05):1.
¡¡GUO Jing,SONG Jingjing,KONG Fanchao.Overview of modeling and simulation technology for propellant pressurization feed system of liquid rocket engine[J].Journal of Rocket Propulsion,2015,41(01):1.
[3]ÓÚ ¿µ,лÈÙ»ª,³ÂÏþ½­.±íÃæÕÅÁ¦ÖüÏäµç×ÓÊøº¸½Ó¹¤ÒÕÑо¿[J].»ð¼ýÍƽø,2015,41(05):89.
¡¡YU Kang,XIE Ronghua,CHEN Xiaojiang.Study on electron beam welding process for surface tension tank[J].Journal of Rocket Propulsion,2015,41(01):89.
[4]ÁõÖлª,ËÕ ³¿,Íô¾ü°²,µÈ.Æø·ĤƬÉè¼ÆÑо¿[J].»ð¼ýÍƽø,2015,41(05):95.
¡¡LIU Zhonghua,SU Chen,WANG Junan,et al.Design and study of pneumatic diaphragm in gas circuit[J].Journal of Rocket Propulsion,2015,41(01):95.
[5]Ѧ Þ±,²ÌÕðÓî,²Üºì¾ê,µÈ.»ùÓÚ¿ÉÊÓ»¯Æ½Ì¨µÄÒºÇâ/ÒºÑõ»ð¼ý·¢¶¯»úºËÐIJ¿¼þÖÊÁ¿¼ÆËã[J].»ð¼ýÍƽø,2015,41(04):61.
¡¡XUE wei,CAI Zhenyu,CAO Hongjuan,et al.Mass calculation of key assembly units in LH2/ LOX rocket engine based on visual interface[J].Journal of Rocket Propulsion,2015,41(01):61.
[6]ÄÂÅó¸Õ,ͯ ·É,ÆѹâÈÙ,µÈ.ζȶÔÖüÏäÔöѹϵͳµÄÓ°Ïì·ÖÎö[J].»ð¼ýÍƽø,2015,41(04):74.
¡¡MU Penggang,TONG Fei,PU Guangrong,et al.Influence of temperature on tank pressurization system[J].Journal of Rocket Propulsion,2015,41(01):74.
[7]¸ß³¯»Ô,Áõ Óî,Ф Ф,µÈ.´¹Ö±×ŽÖظ´Ê¹ÓÃÔËÔØ»ð¼ý¶Ô¶¯Á¦¼¼ÊõµÄÌôÕ½[J].»ð¼ýÍƽø,2015,41(03):1.
¡¡GAO Zhao-hui,LIU Yu,et al.Challenge to propulsion technology for vertical landing reusable launch vehicle[J].Journal of Rocket Propulsion,2015,41(01):1.
[8]ÉêÖÇ˧,µÈ.Æø¶¯ÔöѹÆ÷¼¼Êõ¼°ÆäÔÚ¿Õ¼äÍƽøϵͳµÄÓ¦ÓÃ[J].»ð¼ýÍƽø,2015,41(03):15.
¡¡SHEN Zhi-shuai,RUAN Hai-jun,et al.Pneumopump technology and its application in space propulsion system[J].Journal of Rocket Propulsion,2015,41(01):15.
[9]ÕÅ Ïè,Ðìºéƽ,°²Ñ©ÑÒ,µÈ.ÒºÌå»ð¼ý·¢¶¯»úÎÈ̬ÔËÐйÊÕÏ Êý¾Ý¾ÛÀà·ÖÎöÑо¿0[J].»ð¼ýÍƽø,2015,41(02):118.
¡¡ZHANG Xiang,XU Hong-ping,AN Xue-yan,et al.Clustering analysis for fault data in steady process of liquid propellant rocket engine[J].Journal of Rocket Propulsion,2015,41(01):118.
[10]ñ¼ Ψ,ãÆÓîÁú,½ðÖ¾ÀÚ,µÈ.ij·¢¶¯»úÎÐÂÖ±Ãת×Ó¸ßγ¬ËÙ/Æ£ÀÍÊÔÑéÑо¿[J].»ð¼ýÍƽø,2015,41(01):15.
¡¡DOU Wei,YAN Yu-long,JIN Zhi-lei,et al.Fatigue experiment of turbo-pump rotor at over-speed and high temperature condition[J].Journal of Rocket Propulsion,2015,41(01):15.

±¸×¢/Memo

ÊÕ¸åÈÕÆÚ:2017-07-20; ÐÞ»ØÈÕÆÚ:2017-09-05 ×÷Õß¼ò½é: ãÆ ËÉ(1988¡ª),ÄÐ,²©Ê¿Ñо¿Éú,Ñо¿ÁìÓòΪҺÌå»ð¼ý·¢¶¯»ú½á¹¹¶¯ÌØÐÔ

¸üÐÂÈÕÆÚ/Last Update: 1900-01-01